Iron Ore and pellets
Vale’s iron ore production achieved a record for a second quarter of 91.8 Mt in 2Q17, 5.6 Mt higher than in 1Q17. Factors like the better operational performance in the Northern System and the weather-related seasonality can explain the good results. Production was 5.0 Mt higher than in 2Q16 due to the S11D ramp-up in the Northern System and the ramp-up of new beneficiation and crushing facilities in the Southeastern System.
Vale’s pellet production reached 12.2 Mt in 2Q17, 1.7% lower than in 1Q17 due to scheduled maintenance stoppages in one line of the Oman pellet plant. The result was 21.5% higher than in 2Q16 mainly due to the maintenance stoppages in 2Q16 and the resumption of the Fabrica plant in July 2016.
Find out more about our iron ore and pellet activities
Nickel
Production of nickel totaled 66,000 t in 2Q17, 7.7% lower than in 1Q17 and 16.0% lower than in 2Q16, mainly due to the rebuilding of furnace #2 in preparation for the transitioning to a single furnace operation in Sudbury, and the scheduled maintenance shutdown in Sudbury.
Find out more about our nickel activities
Coal
Coal production achieved a record production for a quarter, with 3.0 Mt in 2Q17. The production came exclusively from the Moatize mine in Mozambique. Total coal production was 24.8% and 101.8% higher than in 1Q17 and 2Q16, respectively, with two thirds of total production being of metallurgical coal.
Find out more about our coal activities
Copper
Copper production reached 100,800 t in 2Q17, being 6.2% and 4.6% lower than in 1Q17 and 2Q16, respectively. The lower production in Sudbury as a result of a scheduled maintenance shutdown in the surface plants and the mines can explain the decrease.
Find out more about our copper activities